Peter Pan San Francisco
Continuing my work for threesixty Entertainment, I spent eight months setting up and running the touring show Peter Pan. Working at the Head of Site Production I was responsible for the development of all site aspects – from dealing with the site owners (the city of San Francisco) and getting all of the permits (electrical, building control, fire, food safety, planning, trucking) – I also dealt with California registered architect and structural engineers to ensure that the European designs for the tent would work in the USA.
All equipment (twenty seven shipping containers) were brought to the site in San Francisco and unloaded, the big top, seating and staging and other venues built – as well as building extensive outdoor decked areas and the Peter Pan exhibit – a newly built structure for the US tour.
I also worked with City Engineers and electrical contractors to connect mains electricity to the site to reduce the need for generators, fuel usage and the impact on the environment.
Working in the US was an amazing experience and I now have a great depth of knowledge taking equipment shows and productions from the UK overseas.